HuaDong Power start to deliver 5.4MW Gensets to Goldwind in Laos
HuaDong Power start to deliver 5.4MW Gensets to Goldwind in Laos In July, 2025, HuaDong Power start to deliver 18 sets 300kw diesel gensets to Goldwin. These gensets will be used in the wind power generation project in Laos from Goldwin as startup and backup power. These gensets are container type, the core engine is equipped with YuChai YC6MJ500L-D21, the core generator is equipped with HuaDong HD315FS. The voltage is 400v, and frequency is 50hz. Also equipped with ATS and 500L diesel tank, which can ensure the genset will provide enough power for the wind power generation system work at least 10 hours automatically. The shining point of these gensets is that HuaDong power have installed solar power in these gensets to charge the startup battery. That is in order to ensure no matter what the local weather is, the wind generator can be started up and the turbine blade will adjust direction automatically according to the wind direction.